Extension to Detached Property, Essex

The Job To build a rear and side extension to a detached property.

Duration 26 weeks  Location   Essex

The works involved partial demolition of a previous extension, and building over to create open plan living space to the rear of the house as well as additional en- suite bathrooms and larger bedrooms to the first floor.

After stripping out, […]

By |December 30th, 2014|Case Study|0 Comments

Refurbishment Work To School After Significant Flooding

During the bank holiday weekend of the summer holiday period in 2014, Queen Elizabeth Girls School where we regularly carry out works suffered flooding in some of their buildings..

The flood occurred as debris had found its way from flat roof areas into the rainwater discharge system and had caused a physical blockage under the ground.  […]

Queen Elizabeth Girls School, Barnet – Re-flooring to Science and Technology Departments

The project
To remove over 1000 square meters of vinyl floor tiles in science and technology areas of a girls school in Barnet. To then prepare the floors by applying latex self-levelling compounds and finishing with new anti-slip vinyl sheet flooring.

The problems
Both Science and Technology departments in schools have a lot of equipment and furniture. […]

By |September 24th, 2014|Case Study|0 Comments

Curtain Walling Installation at The Totteridge Academy

The challenge

The Ravenscroft School in Barnet, North London, was shortly to become The Totteridge Academy but staff were concerned about some of the buildings. A lot of heat was being lost through the walls in its library and science blocks. Adept was called in to assess the state of the walls and recommend what action […]

Daily Fish scales up with Adept

The challenge

Daily Fish Supplies is a high-quality fish supplier based in central London and serving a range of clients including top hotels and restaurants.

Because of expanding orders Daily Fish needed more office space and bigger production and cold-store areas which was to be achieved using mezzanine floors and wall partitioning. The company already occupied […]

Queen Elizabeths Girls’ School gives a warmer welcome thanks to Adept

The challenge

The problem for Queen Elizabeth’s Girls School in was that its main entrance was in the wrong place. Built on an inclined site in Barnet, north London, the entrance was in the middle of the building. This meant visitors had to walk through part of the school before they could sign in, which […]

Purpose Built Warehouse & Showroom by Adept

Chris Stevens is an independent decorator Merchants with a ceramic tiling and bathroom supply arm.

Adept Building Services were approached by the directors to seek a price to demolish an existing building on the site which was previously a car showroom / workshops and to build a purpose built warehouse and showroom facility

This facility was […]